Children's Museum of New Hampshire
Dover, New Hampshire
completed 2009
Awarded LEED Silver
photography by Sean Hennessy (Copyright Hennessy Productions)
Buoy Gallery
Kittery, Maine
completed 2008
An artist gallery portion of the conversion of a mid-century post office in Kittery, Maine, into a mixed use building.
WYPR Accessibility and Facade Renovation
Baltimore, Maryland
first phase completed 2019
WYPR was looking to make their front entry accessible and reduce the solar heat gain on the front facade. ARQ designed a sloping entry walkway integrated with native planting as the first phase of the renovation (completed 2019). A series of perforated screen to help reduce the intensity of sunlight of the east-facing side of the building has been planned as a second phase of the project.
Smithsonian Institution
Historic Building Report
Washington, District of Columbia
completed 2008
Report which described the original design of and subsequent modifications to a mid-century Smithsonian Institution museum building. The report was completed in preparation for an extensive 2010 renovation of the museum building.
Seacoast Science Center
Master Plan
Rye, New Hampshire
completed 2021
Study of project development options for renovation of and addition to the existing museum. Review included anticipated sea level rise as part of the site development analysis.